Dual power automatic transfer switches (ATS) switch the load between the main supply and a backup source, ensuring continuous power for critical panels, machinery and facilities.
Trade term: FOB / CIF. MOQ 20 pcs per model. Lead time 3–7 working days for standard models, 15–30 days for customized builds. Payment 50% T/T deposit, balance against copy of B/L.
| Type | Automatic transfer switch (mechanical) |
|---|---|
| Rating | 63 A ~ 800 A |
| Poles | 2P / 3P / 4P |
| Transfer time | < 1.5 s (typical) |
| Control | Auto / manual, delayed transfer |
| Standard | IEC 60947-6-1 |
Values above are typical ranges for this product family. Final specifications are confirmed against the model data sheet before quotation; dimensional drawings and test reports are provided on request.
Reference: Reference IEC 60947-6-1. Certificates are offered only where available for the selected model.